mmaria
Been spending a lot of time on here!
- Joined
- Sep 4, 2013
- Messages
- 6,494
- Reaction score
- 2,991
- Location
- Wonderland
- Can others edit my Photos
- Photos OK to edit
I got some documents, work related, to translate in English and send them further.
The real trouble is that the lady who wrote those doesn't write nice and concise sentences. She puts a lot in just one sentence and use unnecessary words an terminology . I :roll: and get
whenever I read something that she wrote. I used to deal with her more in the past, that's not the case these days and I thank God for that.
Anyway... I've read a lot of what she wrote in this document and I have headache. The problem is not the theme (that's a part of my job) it's her. I tried to translate some parts but I'm aware that it's full of grammar mistakes because I'm not able to fully simplify her sentences. ... can you please help with the grammar issues, telling me where I did wrong!
"...For the project of the reconstruction and building sewerage network for the central part of the city, which we nominated, the Water discharge consent is provided by a competent body of public institution State's Waters. The project is a separate type.
In accordance with the goal of resolving mentioned issues, our Municipality defined the need for sewage collectors installation. That need is noted in our strategic document for development.
Strategic goal number 4 - To create and insure ecologically healthy and infrastructural built environment based on European standards
Operative goal 4.4 - Significantly improved water, sewerage and reconstructed heating network in our Municipality, until the year 2015.
Taking the strategic goal into a consideration, one of the priority projects that Municipality needs to implement in 2013-2015 period of time, is the project of construction and reconstruction of priority parts of sewerage network and installing collectors.
....In order to improve the water supply system, so far Municipality has carried out the following: cleaning and rinsing trap and reservoir, reservoir reconstruction, replacement of old pipes, installation of chlorinators, chemical and bacteriological analysis of water.
In the area of ​​the narrower part of the city it is necessary to replace the ACC pipes in a length of 4,000 m with the PE 100-350 pipes. In populated place X its necessary to replace ACC 200 pipes with the PE 200 pipes in a length of 8,700 m. In Y water supply system it is necessary to replace LZ pipes with the PE 80 pipes, in length of 7000 m, and also ACC 100 pipes with the PE 100 pipes, in the length of 3,000 m. In Y water supply system its necessary to replace the ACC 80 pipes with the PE 80 pipes in the length of 8,500 m...."
thank you thank you
The real trouble is that the lady who wrote those doesn't write nice and concise sentences. She puts a lot in just one sentence and use unnecessary words an terminology . I :roll: and get
Anyway... I've read a lot of what she wrote in this document and I have headache. The problem is not the theme (that's a part of my job) it's her. I tried to translate some parts but I'm aware that it's full of grammar mistakes because I'm not able to fully simplify her sentences. ... can you please help with the grammar issues, telling me where I did wrong!
"...For the project of the reconstruction and building sewerage network for the central part of the city, which we nominated, the Water discharge consent is provided by a competent body of public institution State's Waters. The project is a separate type.
In accordance with the goal of resolving mentioned issues, our Municipality defined the need for sewage collectors installation. That need is noted in our strategic document for development.
Strategic goal number 4 - To create and insure ecologically healthy and infrastructural built environment based on European standards
Operative goal 4.4 - Significantly improved water, sewerage and reconstructed heating network in our Municipality, until the year 2015.
Taking the strategic goal into a consideration, one of the priority projects that Municipality needs to implement in 2013-2015 period of time, is the project of construction and reconstruction of priority parts of sewerage network and installing collectors.
....In order to improve the water supply system, so far Municipality has carried out the following: cleaning and rinsing trap and reservoir, reservoir reconstruction, replacement of old pipes, installation of chlorinators, chemical and bacteriological analysis of water.
In the area of ​​the narrower part of the city it is necessary to replace the ACC pipes in a length of 4,000 m with the PE 100-350 pipes. In populated place X its necessary to replace ACC 200 pipes with the PE 200 pipes in a length of 8,700 m. In Y water supply system it is necessary to replace LZ pipes with the PE 80 pipes, in length of 7000 m, and also ACC 100 pipes with the PE 100 pipes, in the length of 3,000 m. In Y water supply system its necessary to replace the ACC 80 pipes with the PE 80 pipes in the length of 8,500 m...."
thank you thank you