Despite the fact that we had a summer monsoon dump buckets of water on us after they had all the grading/prep work done yesterday, we survived with only minimal wash outs. After some short repair work this morning they were on to paving. Very first pass on the upper landing a roughly 50 x 100 area, with buildings, walls, walks, curves, etc. to work around. Lots of starts, stops, moves, but they are finally around the last curve and on to the driveway, where they stopped for the day. Tomorrow should go pretty fast, as once they set the machine they won't have to pick it up again until they are done or finished for the day!!!! I guess some might think getting excited over a paved driveway is silly, but when you've dealt with the gravel, ruts, dust, 4 wheel drive for 11 years, like we have, it is a big deal.
First of the asphalt going down.
Paving09062017_921.jpg by William Raber, on Flickr
First of the asphalt going down.