I had a fun day at work.
The Fire/EMS Department has to check if any new residential development is within seven minutes of an existing fire station; any parcels outside seven minutes have a fee levied. I set up a web app that allows the Investigators run the check. The problem is, and I can't really do anything about it, proposed roads are probably not in the database, so the we can't readily run those in the coverage analysis.
In that event, we have to add the roads into the database, rebuild the road network, and run the analysis locally. It's not difficult, but adding the roads can be very time consuming. We need at least a drawing (drafting or another map). I can then take that image, "paste" it to my map (georeferencing) by making registration points on both the drawing and the map, then trace the developer's roads as new data records for my roads. I then set speed limits and relative elevation (typically zero), run a calculation to determine how long it takes to drive across each road segment, then I tell the computer to "build network." Once that's done, I run the time analysis, make a final map, add a narrative to the email and it's off to the Fire folks. The longest part is georeferencing and tracing the roads. I grabbed a PNG the developer emailed - just a copy of a map with their lines drawn on it. Pasted it to my work map, traced the roads and BAM - most of the development is covered. It was a little over four hours, only because I had some issues with the network so I ran it a second time. Unfortunately, what they REALLY wanted was the area that wasn't covered; they didn't draw those lines on the little map. It's OK, the boss sent on.
Now comes the rest of the day (and some of Monday). I extracted the large scale drawings (1" = 30') from the supplied PDF (I think there were 16 of them) using a screen capture tool. Now I'll bring each into Photoshop, then stitch them together so I have one big-@$$ image (60" x 60" should cover it), then georeference THAT bad boy. Once those roads are added, I'll run it again, though I don't think it will matter much - there are no additional access roads.
The boss is going to tell / suggest that either the developers run the analysis themselves, or supply us with the electronic CAD (drafting) files, and we will run everything. If they want us to do it, he's going to say he needs another full time contractor just to handle this.