I can relate to shared space. My studio space doubles as a garage for two vehicles. When I set up one or both get evicted for the duration. I've been working toward streamling things. Just completed a built in storage area for equipment (lights, reflectors, modifiers, stands, etc.) Currently working on a storage rack for rolled backdrops and floor mats. Next up is a hanging rail system for lights, backdrops, etc. The ultimate goal is to be able to back a vehicle out, be set up in 30 mins and be able to get everything back in 30 mins.
I have been working on setting up a new battery bank and inverter in my RV so my shop was a disaster. It took me about an hour to set up for this shoot. My shot was intentionally built with a small roll up door so I would not put a car in. Only my ATV's, Motorcycles, etc.
I have seen good roller systems for paper. Have you found a good roller system for canvas? That is my big hang up right now. I have 3 -10'x20' canvases and not having to unfold and get the wrinkles out would be nice.
Sadly my 30x40 free standing shop is stuffed to the gills. One side holds a tractor, atvs, lawnmower, welders, generator....,and the other woodworking equipment and tables. Ive thought seriously that it might be time to clean it out, but I still enjoy/do a lot of my vehicle maintenance, metal working, and woodworking.
I've even thought at times about one of those free standing prefab buildings that could be finished out inside as a studio, but the garage is in a walk out basement, that's heated and cooled. When we built the house we went with 10' high walls and larger doors to provide clearance for our dually. The remainder of the basement is finished with a media room, bathroom, kichen/ bar/dining area. So basically everything I need.
There's several manufactures of rack systems out there, but it can get pricey. With the tools and skills I have, I'm looking at hanging two Unistruts
https://www.lowes.com/pd/Superstrut...ld-Galvanized-Half-Slot-Channel-Strut/3128119 one on each side of a bay, just low enough to clear the HVAC. Then hang a couple of traveling rails below that using these
https://www.amazon.com/Genuine-Unis...ocphy=9012738&hvtargid=pla-350917843348&psc=1 they will be universal for hanging lights, reflectors, what ever I need. Lights will be on adjustable arms that fold down when needed and back up When I'm done.
On backgrounds I've started rolling my backgrounds on 1-1/2" pvc. Once rolled they will go in 3-1/2" pvc pipe with caps on each end and stored vertically in a rack on the wall. For hanging I'll use a 3/4" steel conduit suspended from the tracks. I have a compression chuck in mind that will hold the roll from turning, and facilitate rolling it back up.